Sustainable Gains Through Rapid Improvement
- About Us
-
Businesses
-
Main Menu
- Businesses
- Our Businesses Overview
-
Textile
-
Businesses
- Textile
- Overview
- Markets
- Brands
- Expertise
- Media
- Contact Us
- Chemical
-
Floor Covering
-
Businesses
- Floor Covering
- Overview
- Product Catalog
- Inspire Me
- Segments
- Technical
- M/PACT Our Planet
- Contact Us
-
Performance Solutions by Milliken
-
Businesses
- Performance Solutions by Milliken
- Overview
- Consulting Services
- Education and Events
- Resources
- Virtual Tour
- Contact Us
- Products
-
Industries
-
Main Menu
- Industries
- Industries Overview
- Agriculture
- Apparel
- Automotive and Transportation
- Building, Construction, and Infrastructure
- Coatings, Paints, and Inks
- Commercial
- Consumer Goods
- Education
- Energy and Utilities
- Government and Defense
- Healthcare and Life Sciences
- Hospitality
- Manufacturing
- Packaging and Print
- Residential
- Sustainability
- Careers
Sustainable Gains Through Rapid Improvement
A consumer product client had a specific need for increasing output on constraint assets at strategic locations over a 4-month period. Client did not have the bandwidth or problem-solving maturity to address these gaps in-house.
Background: A consumer product client had a specific need for increasing output on constraint assets at strategic locations over a 4-month period. Client did not have the bandwidth or problem-solving maturity to address these gaps in-house.
Win: Defined as 5 to 10 points of OEE (not percent improvement) on the constraint assets over a 4-month period.
Assessment: PSbyM’s unique assessment process provided insight on losses, specific projects, PSbyM and site ownership of projects, deliverables for each project.
Project Support: As part of PSbyM’s Rapid Improvement Process , Milliken provided project ownership (where needed), project coaching, hands-on support, sustainment processes, and governance to make certain the sites were successful in the implementation.
Wins across the five strategic sites:
Keys to Success:
- Project selection designed around length of engagement. More 6-week to 8-week projects. If projects were 6-months, they were out of scope.
- Need to have more projects than 10 points of OEE. There will be headwinds.
- Cadence of PSbyM support matched the needs of the implementation.
- Weekly governance calls (showing performance) with site practitioners, site leadership, corporate leadership, PSbyM leadership. Must recognize and course correct quickly.
- Partner with the sites and give them the credit.
Other Benefits:
- Building internal capabilities of the team
- Replication of improvements to other machines in site
- Learning to see the value in Continuous Improvement
- Building the understanding of power of full Operational Excellence System
Interested in experiencing similar process improvements at your facility? Learn more about the Milliken Rapid Improvement Process or any of our manufacturing consulting services .